CB21 Build Log: Part 3

By Singularity Computers

In part 3 I complete the assembly and install the rest of the water-cooling components. I swap the radiators and the reservoir tube. I install two extra SSDs along with the M.2 and the SSHD which are in this build. I also complete the side panel and case modifications. In part 4 I will complete the water-cooling loop and fill it, and bring the system close to completion.